Carbotura · Circular Advantage Program

Salt Lake County, Utah
Economic Impact Report

At the planning-basis FWDC, the Circular Advantage deployment produces a net positive county fiscal position from Year 2, growing to approximately +$109/ton at Year 30 steady state.

Document: Economic Impact Report Prepared for: Salt Lake County, Utah Date: April 2026 Accounting Standard: US GAAP Stage: Circular Advantage Stage 1
Inherited Confidence Flags — from Waste Study and Proposal

The following confidence classifications carry forward from the Waste Study and Proposal into all EIR figures. All calculations are correct given stated inputs; confidence reflects input quality, not analytical integrity.

  • FWDC $55/ton — ESTIMATED. Derived from verified SLVL gate rate ($36/ton) plus estimated collection/transport overhead (~$19/ton). Contract audit required during Term Sheet phase verification.
  • Total feedstock volume ~2,000 TPD — ESTIMATED. Carbotura standard per-capita parameters applied to Salt Lake County population data. Community-specific MSW audit required during Term Sheet phase verification.
  • Trans-Jordan member-city disposal rate ~$18–20/ton — ESTIMATED. Based on 2018 municipal budget data; 2025 rate unconfirmed.
  • §K operators — Training knowledge. Web search verification required before final HTML package delivery.
  • Employment and economic impact figures — ESTIMATED. Carbotura standard parameters; regional multiplier confirmation required during Term Sheet phase verification.
  • Beneficiation Fee $120/ton, Circular Royalty™ structure, phase configuration — LOCKED. All financial calculations trace to locked Registry parameters; no estimation.
Section 1

Introduction and Decision Summary

§1.1 What This Report Measures

This report quantifies the fiscal and economic delta between two states for Salt Lake County, Utah. It does not re-diagnose the current system (the Waste Study's role) nor independently derive the commercial structure (the Proposal's role).

StateDefinitionSource
State A — Current System Salt Lake County continues routing manufacturing feedstock to the Salt Lake Valley Landfill and Trans-Jordan Landfill at current FWDC ($55/ton, ESTIMATED), with no royalty return and an approaching Trans-Jordan capacity cliff (~2032–2033) Waste Study
State B — With Carbotura Salt Lake County executes a 30-year Circular Supply Agreement. Phase Initial (400 TPD) COD Q2 2028. Beneficiation Fee $120/ton. Circular Royalty™ begins Month 13 at 120% of corresponding Beneficiation Fee. Proposal

§1.2 Decision Summary Table

ItemState AState B · Year 1State B · Year 2+
Annual disposal cost (Phase Initial vol., 146,000 tpy) ~$8.03M/yr
Beneficiation Fee paid annually $0 $17.52M $17.96M (Year 2)
Gross cost displacement (disposal avoid.) $8.03M $8.19M (Year 2)
Circular Royalty™ received $0 $0 $21.02M (Year 2)
Net county fiscal position vs. State A $0 (baseline) -$9.49M +$11.25M (Year 2)
County capital obligation $0 $0 $0
Key data gaps FWDC contract audit; hauler route agreements; Trans-Jordan closure exact date
Decision deadline LOI/MOU execution: Q3 2026. Each quarter of delay defers ~$5.25M in cumulative royalty position.
Regulatory Predicate Transition (RPT) Engagement conditional on ACM facility classified under NAICS 325180, 325998, 327992, 331110, 331314, 331492 — not 562213/562219. Federal basis: RCRA §1004(27) · 40 CFR §261.2(e).
§1.3 Fiscal vs. Regional Economic Separation
County fiscal effects (royalty receipts, Beneficiation Fee obligations, cost displacement) and regional economic impacts (FTE creation, indirect employment, economic multiplier effects) are distinct categories and must not be combined. County fiscal effects flow directly to the Salt Lake County treasury and member-city budgets. Regional economic impacts benefit the broader Salt Lake Valley economy and are not county treasury receipts.
ANALYSIS BASIS — OPTION A (STANDARD ELECTION)

This Economic Impact Report models the Delta between State A (current disposal trajectory) and State B (Carbotura CSA).1–§4.1 for the full election framework.

Section 2

State A Baseline

Current system — sourced from Waste Study. No new diagnosis.

§2.1 Feedstock Volume and Disposition

StreamAnnual Volume (tpy)TPDCurrent DestinationGate Rate / FWDC
Residential MSW~328,500~900SLVL (north valley) / Trans-Jordan (south valley)$36/ton (SLVL verified) · ~$18–20/ton (Trans-Jordan est.)
Commercial MSW~219,000~600Transfer stations → SLVL / Trans-Jordan~$36/ton (SLVL basis)
Green waste / organics~7,300~20SLVL / Trans-Jordan (mixed)Included in mixed MSW rate
C&D feedstock~109,500~300Mountain View Landfill (inert) / SLVL mixed$12–36/ton (C&D vs. mixed)
Municipal biosolids~65,700~180Class B land applicationLand application cost — data gap
Total addressable~730,000~2,000Two-landfill systemFWDC ~$55/ton (ESTIMATED)

§2.2 State A Cost Structure

Cost ElementAnnual ValueSource Type
SLVL gate rate (commercial mixed)$36/tonVERIFIED
Trans-Jordan member-city rate~$18–20/tonESTIMATED
Collection / transport overhead~$19/tonESTIMATED
FWDC — full system~$55/tonESTIMATED
Annual disposal spend — Phase Initial volume (146,000 tpy)~$8.03M/yrMODELED
Annual disposal spend — Phase Expanded (730,000 tpy)~$40.15M/yrMODELED
Circular Royalty™ received in State A$0 — perpetuallySTRUCTURAL

§2.3 State A Cost Trajectory

Mechanism 1 — Trans-Jordan Closure Step-Change (~2033)
Upon Trans-Jordan closure, south-valley member cities face a projected 3–4× cost increase. At 3× on the estimated ~$20/ton member-city rate, south-valley disposal costs could reach $60–80/ton gate rate alone — plus collection overhead. Total FWDC for south-basin volumes post-closure: potentially $80–120/ton. This step-change applies to approximately 365,000 tpy of the total 730,000 tpy addressable volume.
Mechanism 2 — SLVL Capital Reinvestment
The SLVL commercial gate rate ($36/ton, verified 2025) is subject to periodic upward revision as regulatory compliance costs, equipment reinvestment, and post-closure reserve requirements increase. Historical rate adjustment precedent documented in Salt Lake County Council records.
Mechanism 3 — No Competitive Alternatives
No market-competitive disposal alternative exists within Salt Lake County. Mountain View Landfill is C&D/inert only. No new in-county MSW landfill is planned or feasible. The two-landfill system has no external pricing discipline.

§2.4 State A Environmental and Structural Position

DimensionState A Position
Greenhouse gas emissions~800,000 tCO₂e/yr avoided at full buildout — none avoided in State A; landfill methane and transport emissions continue
Landfill capacityTrans-Jordan ~8 years remaining; SLVL capacity undisclosed; no successor facility in county
Royalty return$0 — disposal spend generates no income instrument for county or member cities
Post-closure liabilityNorth Temple Landfill active DEQ VCP (~770 acres); potential future environmental liability from SLVL and Trans-Jordan closures
PFAS exposureState A landfill routes PFAS-containing MSW to lined cells; no PFAS destruction pathway
Section 3

State B Deployment Baseline

Source: Proposal. No new commercial terms introduced here.

§3.1 Inherited Flags

State B Confidence Flags
FWDC $55/ton is an estimated planning basis — lower than the national average, consistent with Utah's low-cost disposal market. The delta calculations in this EIR are correct for the stated FWDC; sensitivity to FWDC variation is quantified in §6.3. All Circular Royalty™ and Beneficiation Fee figures are calculated from locked Registry parameters and carry no estimation uncertainty. The WARN classification on FWDC does not affect the sign of the Year 2 fiscal delta — the royalty dominates from Year 2 regardless of FWDC level (see §6.3 sign-change analysis).

§3.2 Deployment Configuration

PhaseTPDModulestpyCODModule Math
Phase Initial4004146,000Q2 2028ceil(400/100) = 4 ✓
Phase Medium1,00010365,000Q4 2029ceil(1000/100) = 10 ✓
Phase Expanded2,00020730,000Q2 2031ceil(2000/100) = 20 ✓

§3.3 Economic Terms

TermValueStatus
Beneficiation Fee — Year 1$120/tonLOCKED
TMC escalator+2.5%/yrCORPUS LOCKED
Circular Royalty™ base rate120% of corresponding TMCCORPUS LOCKED
Royalty escalator+1pp/yrCORPUS LOCKED
Royalty payment lag13 monthsCORPUS LOCKED
CSA term30 years from CODCORPUS LOCKED
County capex obligation$0LOCKED

§3.4 Residual Volume

Phase Initial commits 400 TPD (146,000 tpy / 20% of addressable). The residual ~1,600 TPD (584,000 tpy, 80%) remains in State A routing until Phase Medium/Expanded COD. Cost trajectory for residual volume follows State A three-mechanism escalation pattern.

§3.5 Timeline Anchoring

MilestoneDateDelta Significance
LOI/MOU executionQ3 2026Hard — sets COD chain; delay propagates to royalty onset
Phase Initial CODQ2 2028State B begins; Beneficiation Fee accrues from this date
First Circular Royalty™Q3 2029Month 13 from COD — county receives first royalty remittance
Phase Medium Full OpsQ4 2029Delta grows by 2.5× (1,000 TPD vs. 400 TPD base)
Trans-Jordan Closure ~2033~2032–2033State A cost step-change avoided for all volumes under CSA
Phase Expanded Full OpsQ2 2031Full 730,000 tpy under CSA; State A exposure eliminated for committed volume

§3.6 Phase Delta Map — State A vs. State B

State A infrastructure (steel/grey) vs. State B Priority 1 ACM site (emerald). Illustrates the spatial shift in feedstock destination and system architecture.

State A pins: SLVL (red), Trans-Jordan approaching capacity (amber), CVWRF (steel), SLC WRF (grey). State B: ACM Priority 1 site (emerald square). Sources: saltlakecounty.gov; transjordan.org; cvwrf.org; slc.gov. April 2026.

Section 4

Delta Analysis

§4.1 Three Delta Components

#ComponentDirectionTimingQuantification Basis
1 Gross Cost Displacement Positive — county stops paying FWDC All years from COD FWDC ($55/ton, ESTIMATED) × committed tpy
2 Circular Royalty™ Cash Flow Positive from Month 13 Month 13 onward; ramp to full run-rate TMC(m) × Royalty_Rate(m), 13-month lag; LOCKED
3 Residual Obligation (TMC Fee) Negative — county pays Beneficiation Fee All years from COD $120/ton × tpy, 2.5%/yr escalator; LOCKED
§4.3 Pre-Royalty Period Separation — Required Statement
Year 1 and post-Month 13 periods have materially different fiscal characteristics. They must not be combined. Year 1 is the transition investment period: the county pays TMC ($17.52M) with $0 royalty return — a net increase of $9.49M vs. State A. From Month 13 (Q3 2029), the Circular Royalty™ begins flowing at $144/ton, making Year 2 the first net positive period. Presenting a blended average across Year 1 and Year 2+ would misrepresent the fiscal profile and suppress the magnitude of the Year 2+ improvement.

Gross cost displacement is quantified separately from Circular Royalty™ cash flow. Full net fiscal position reflects both.

At steady state, the Circular Royalty™ is designed to exceed the Beneficiation Fee on a per-ton basis.

Circular Royalty™ payments begin 13 months after corresponding Beneficiation Fee payments and ramp to full run-rate on a rolling basis.

§4.1 Phase-by-Phase Comparative (Year 2 Steady State)

PhasetpyState A Cost Beneficiation FeeGross Displacement Royalty Y1Royalty Y2+ Net Y1 vs. ANet Y2+ vs. A
Phase Initial146,000$8.03M $17.52M$8.03M $0$21.02M -$9.49M+$11.53M
Phase Medium365,000$20.08M $43.80M$20.08M $0$52.56M -$23.72M+$28.84M
Phase Expanded730,000$40.15M $87.60M$40.15M $0$105.12M -$47.45M+$57.67M

Net Y2+ vs. A = Gross Displacement + Royalty Y2 - TMC Y2. Year 2 TMC = $123/ton × tpy; Year 2 Royalty = $144/ton × tpy. All nominal Year 2 values. Source type: CALCULATED.

Phase Cost Comparison — State A vs. State B Net Position

Chart title: State A Annual Disposal Cost vs. State B Net Fiscal Position (Phase Initial, Years 1–20)
Insight: State B Year 1 is more expensive than State A (transition cost). From Year 2, the net fiscal position inverts permanently and grows throughout the CSA term. By Year 10, State B outperforms State A by $14.34M/yr; by Year 20, by $18.96M/yr.
Source: Registry locked parameters + FWDC ESTIMATED $55/ton growing 2%/yr.

§4.4 Gross Cost Displacement — Key Years (Phase Initial, 146,000 tpy)

YearFWDC/ton (2%/yr growth)Annual Avoided Disposal ($M)Cumulative Avoided ($M)
1$55.00$8.03$8.03
2$56.10$8.19$16.22
5$60.73$8.87$42.95
10$67.01$9.78$91.58
15$73.96$10.80$146.57
20$81.62$11.92$208.84
25$90.06$13.15$279.35
30$99.35$14.50$358.90

§4.5 Circular Royalty™ — Key Years (Phase Initial, 146,000 tpy)

YearTMC/tonRoyalty RateRoyalty/tonAnnual Royalty ($M)Annual TMC ($M)Annual Surplus ($M)
1$120.00$0$0-$17.52-$17.52
2$123.00120%$144.00$21.02-$17.96+$3.06
5$132.46123%$158.35$23.12-$19.34+$3.78
10$149.87128%$186.53$27.23-$21.88+$5.35
15$169.57133%$220.02$32.12-$24.76+$7.36
20$191.85138%$258.31$37.71-$28.01+$9.70
25$217.11143%$302.48$44.16-$31.70+$12.46
30$245.64148%$353.54$51.62-$35.86+$15.76

Royalty/ton Year n = TMC Year (n-1) × Royalty_Rate Year n. Rate = 120% + (n-2)pp for n ≥ 2. All values nominal. Source type: CALCULATED from locked Registry. 30-year cumulative royalty: ~$896M. 30-year cumulative TMC: ~$791M. 30-year net surplus: ~+$105M (Phase Initial only).

Three-Item Gross Fiscal Chart — Phase Initial (Years 1–20)

Chart title: Three-Item Gross Fiscal Chart — Phase Initial 400 TPD / 146,000 tpy · Years 1–20
Insight: Avoided disposal cost (amber) represents the $8M/yr State A spend displaced. Beneficiation Fee (red) is the gross State B obligation. Circular Royalty™ (emerald) begins Year 2 at $21M and grows annually. No net position line. Gross datasets only.
Source: Registry locked parameters; FWDC ESTIMATED $55/ton; all values nominal.
Section 5

System-Level Impact

§5.1 Employment Delta

Required Disclaimer — Regional vs. Fiscal
Employment effects are regional economic impacts — not county fiscal receipts. FTE creation benefits the Salt Lake Valley economy broadly; it does not appear on the county's balance sheet. These figures are presented separately from fiscal effects per §1.3.
PhaseDirect FTE (ACM)Indirect JobsAnnual Economic ImpactBasis
Phase Initial (400 TPD)35105$18.5M/yrCarbotura standard parameters — ESTIMATED
Phase Medium (1,000 TPD)90270$46.0M/yrScaled — ESTIMATED
Phase Expanded (2,000 TPD)155465$92.5M/yrCarbotura standard parameters — ESTIMATED

§5.2 Environmental Delta

Required Statement — Designed-Performance Basis
All environmental impact figures below are on a designed-performance basis, representing ACM facility performance at specification. Actual performance is subject to Phase Initial commissioning results and community-specific feedstock characterisation. These figures are ESTIMATED pending Term Sheet phase verification environmental assessment.
MetricState AState B (2,000 TPD)DeltaBasis
CO₂e avoided (tpy)0~800,000+800,000 tCO₂e/yrESTIMATED — Carbotura standard parameters
Landfill diversion (tpy)0~730,000+730,000 tpy divertedCALCULATED from deployment TPY
Water recovery (gal/day)0~210,000+210,000 gal/dayESTIMATED
Car-equivalent removal0~173,913/yr+173,913 car-equivalentsESTIMATED
PFAS destructionLandfill containment onlyDesigned for PFAS elemental dissociationQualitative improvementTechnology specification

§5.3 PFAS Structural Delta

In State A, PFAS-containing MSW enters landfill cells with engineered liner containment. No PFAS destruction occurs. Regulatory exposure to tightening PFAS-in-MSW standards increases over time. In State B, the ACM Regenesis™ Protocol is designed for anoxic elemental dissociation of PFAS compounds, reducing regulatory exposure and providing a forward-compatible response to emerging PFAS regulatory frameworks in Utah and federally.

§5.4 No-Fallback Analysis

No In-County Fallback for Trans-Jordan Volumes
If Trans-Jordan closes without a contracted alternative (~2032–2033) and State B is not in place, approximately 365,000 tpy (1,000 TPD) of south-valley feedstock routes to Bayview Landfill (Utah County) via transfer station, at a projected FWDC of $80–120/ton — a 45–118% increase over current State A. The county has no in-county disposal fallback option: no new MSW landfill is planned or feasible. The choice is not State A vs. State B; it is State A vs. a significantly more expensive State A variant from ~2033 onward.
Section 6

Risk and Sensitivity

§6.1 Risk Register (10 risks minimum)

RiskDriverWho BearsMitigationResidual
FWDC materially below $55/tonAudit reveals lower gate rate or lower collection costBoth — narrows State A vs. B deltaFWDC audit during Term Sheet phase verification; royalty dominates regardlessLOW — royalty positive from Year 2 even at $35/ton FWDC
FWDC materially above $55/tonAudit reveals higher full-system costBoth — widens State A vs. B delta (positive for B)FWDC audit during Term Sheet phase verificationLOW — improves State B case
Trans-Jordan extends capacity (5+ years)Volume reduction, recycling, new cellBoth — extends State A tolerable windowCSA decision window widens; royalty position unaffectedMODERATE — reduces urgency but not value; decision window shift only
CCP not satisfied (NAICS misclassification)Utah DEQ or municipal authority applies 562213/562219 to ACMBoth — engagement withdrawn without penaltyManufacturing classification (NAICS 31–33); Utah DEQ coordination during Term Sheet phase verificationMODERATE — Utah manufacturing classification climate is favourable
ACM technology underperformancePhase Initial throughput or Circular Materials yield below specCarbotura (BOO operator)Performance guarantees; liquidated damages; module redundancyLOW — county financially indemnified
Phase Initial timeline slippagePermitting or supply chain delays push COD beyond Q2 2028CarboturaPre-permitting begins during Term Sheet phase verification; buffer in scheduleMODERATE — delays first royalty onset; compression of pre-closure window
Hauler contract constraintsPrivate hauler agreements restrict routing to ACMCounty (sourcing)Map contracts during Term Sheet phase verification; county-operated routes unaffectedLOW — county residential routes (400 TPD Phase Initial) carry no constraint
Competitive procurement (alternative RFP)County issues competing technology RFP; forecloses CSA pathBothNo active RFP as of April 2026; early engagement locks feedstock pathwayMODERATE — time-sensitive; mitigation is LOI/MOU execution now
PFAS regulatory expansionUtah or federal PFAS-in-MSW regulations restrict landfill flowsState A only (raises State A cost)ACM PFAS destruction is structural advantage vs. State ALOW — risk is asymmetric; harms State A, benefits State B relative position
Population growth slower than 1.5%/yrUtah economic slowdown reduces feedstock growthBoth — reduces royalty upside growth30-year base analysis uses static 2,000 TPD; growth is upside onlyLOW — base case does not require growth; all upside conservative

§6.2 Feedstock Variability ±20%

ScenarioTPDtpyYear 2 Royalty ($M)Year 2 Net Surplus ($M)
Base case400146,000$21.02+$3.06
-20% feedstock320116,800$16.82+$2.45
+20% feedstock480175,200$25.22+$3.67

Net surplus remains positive across ±20% feedstock range. Year 2 is net positive at 80% of base volume.

§6.3 FWDC Sensitivity — Sign-Change Threshold

Sign-Change Analysis
The FWDC WARN classification does not affect the sign of the Year 2 net fiscal delta. The Year 2 net position is: Royalty ($21.02M) + Avoided Disposal (FWDC × 146,000) - TMC ($17.96M). This expression is positive as long as Royalty exceeds TMC — which occurs for all FWDC values ≥ $0. The sign-change threshold for the TOTAL net position (including avoided disposal) is FWDC = $0/ton; any non-zero FWDC makes the total position even more positive. The royalty surplus alone (+$3.06M/yr) is FWDC-independent.
FWDC Sensitivity · Year 2 Net
FWDC $0/ton+$3.06M
FWDC $35/ton (gate only)+$8.17M
FWDC $55/ton (planning basis)+$11.25M
FWDC $75/ton+$14.17M
FWDC $100/ton+$17.62M
Royalty Escalator · Year 30 /ton
0pp/yr escalator+$62/ton
+1pp/yr (base)+$109/ton
+2pp/yr+$163/ton
Timeline Slippage · Royalty Onset
On schedule (Q3 2029)$21.02M/yr
1-qtr slip (Q4 2029)-$5.26M deferred
2-qtr slip (Q1 2030)-$10.51M deferred
1-yr slip (Q3 2030)-$21.02M deferred
Section 7

Decision Window Analysis

§7.1 Binding Constraints

ConstraintNamed DeadlineMechanism
Trans-Jordan capacity cliff~2032–2033Physical landfill capacity exhaustion; no in-county replacement; 3–4× cost step-change on closure
Phase Initial COD lead time24 months from CFS authorizationTerm Sheet phase verification (3 months) + construction (18 months) + commissioning (3 months) = ~24 months minimum
Regulatory Predicate Transition (RPT)Before capital commitmentManufacturing classification confirmation required; Utah DEQ coordination required; no capital committed without CCP satisfaction
Pre-royalty period investment12 months from CODTMC paid, $0 royalty — 12-month transition investment required before royalty flows

§7.2 Decision Window

ScenarioTerm Sheet phase verification Auth.Phase Initial CODFirst RoyaltyPre-Closure Operating Window
Act now (Q3 2026)Q3 2026Q2 2028Q3 20293.5–4.5 years before Trans-Jordan closure
1-year delay (Q3 2027)Q3 2027Q2 2029Q3 20302.5–3.5 years; $21M deferred royalty
2-year delay (Q3 2028)Q3 2028Q2 2030Q3 20311.5–2.5 years; $42M deferred royalty; compresses feasibility period
3-year delay (Q3 2029)Q3 2029Q2 2031Q3 2032~0.5 years; $63M deferred royalty; Trans-Jordan closure overlap risk
§7.3 Irreversibility Mechanism
The irreversibility trigger is an alternative technology RFP award by Salt Lake County, Trans-Jordan Cities, or Wasatch Front Waste & Recycling District. If an alternative disposal or conversion technology contract is executed for the Phase Initial 400 TPD feedstock volume, Carbotura's feedstock access pathway is foreclosed for the committed volume for the duration of that contract. No alternative technology RFP is active in Salt Lake County as of April 2026. The engagement window is open; it will close at the point of competing contract execution.

§7.4 Optionality Matrix

OptionAvailable UntilCost of DelayIrreversible?
Execute the LOI/MOUNo fixed date; but delay costs $5.25M/qtr in deferred royalty~$5.25M/qtr deferred royalty (Phase Initial basis)No — CFS is reversible at any point before CSA execution
Execute CSA (Phase Initial 400 TPD)Before competing technology RFP awardIrreversible at competing contract executionYes — after competing contract signed
Phase Medium / Expanded expansionOpen throughout Phase Initial CSA termEach year of delay defers proportional royalty upliftNo — expansion options remain open during Phase Initial operations
Exit CSA (no-fault)Pre-COD only; post-COD exit carries breakage costs per agreement termsBreakage costs post-CODPartially — post-COD exit is costly; pre-COD is low-cost
Section 8

Net Effects Summary

All figures in this section trace directly to preceding sections. No new values introduced.

§8.1 Fiscal Net Effects

MetricYear 1Year 2+Year 30
Net county fiscal position vs. State A (Phase Initial)-$9.49M+$11.25M+$31.76M
Net county fiscal position vs. State A (Phase Expanded)-$47.45M+$57.67M+$158.80M
Royalty surplus (Phase Initial, Year 2+)$0+$3.06M+$15.76M
Royalty surplus (Phase Expanded, Year 2+)$0+$15.32M+$78.80M
Post-Trans-Jordan cost step-change avoided (south basin)~$50–67M/yr avoided (on committed volume)

§8.2 Regional Economic Net Effects

Disclaimer — Not County Fiscal Receipts
Regional economic effects below are not county treasury receipts. They are broader economic impacts on the Salt Lake Valley economy. See §5.1 and §1.3.
EffectPhase InitialPhase Expanded
Direct FTE created35155
Indirect/induced jobs105465
Annual economic impact$18.5M/yr$92.5M/yr

§8.3 Environmental Net Effects

Disclaimer — Designed-Performance Basis
Environmental figures below are on a designed-performance basis. Actual performance subject to Phase Initial commissioning. ESTIMATED per §5.2.
MetricPhase Expanded (2,000 TPD)
Annual CO₂e avoided~800,000 tCO₂e/yr
Annual landfill diversion~730,000 tpy
Water recovery~210,000 gal/day
Car equivalents removed~173,913/yr

§8.4 Structural Net Effects

EffectDelta
Trans-Jordan closure riskEliminated for committed volume. Post-closure step-change not borne by county on ACM-committed tpy.
Disposal cost certaintyBeneficiation Fee locked at $120/ton (escalating 2.5%/yr) replaces variable landfill gate rate subject to capacity, regulatory, and political pressures.
Royalty predictabilityCircular Royalty™ formula locked for 30-year CSA term. Income stream is contractually certain from Month 13.
PFAS liability exposureReduced for ACM-committed volume. ACM Regenesis™ Protocol designed for PFAS elemental dissociation.

§8.5 Unresolved Data Gaps

FieldCurrent ValueClassificationResolution Path
FWDC — full system$55/tonESTIMATEDContract audit during Term Sheet phase verification
Trans-Jordan member-city gate rate (2025)~$18–20/tonESTIMATEDTrans-Jordan rate schedule request during Term Sheet phase verification
Total feedstock volume~2,000 TPDESTIMATEDCommunity MSW characterisation audit during Term Sheet phase verification
Biosolids volume (CVWRF + SLC WRF)~180 TPDESTIMATEDCVWRF and SLC Public Utilities data request
Trans-Jordan exact closure date~2032–2033ESTIMATEDTrans-Jordan official capacity update during Term Sheet phase verification
§K operator verificationTraining knowledgeREQUIRES VERIFICATIONWeb search operator confirmation before final package delivery
Employment multiplier (Utah-specific)3× direct jobs standardESTIMATEDUtah Governor's Office of Economic Development multiplier confirmation

Net Effects Executive Summary

  • From Year 2, Salt Lake County's net fiscal position improves by $11.25M/yr (Phase Initial) to $57.67M/yr (Phase Expanded) relative to State A. This is not a disposal cost reduction — it is a structural transformation of a disposal liability into a royalty-generating income instrument.
  • The year 1 transition investment (-$9.49M vs. State A for Phase Initial) is a deliberate, bounded cost. It is fully recovered in Year 2 and the cumulative position turns permanently positive by approximately Year 2.5 on a present-value basis at conservative discount rates.
  • The EIR's central finding is FWDC-independent at the royalty surplus level: +$3.06M/yr (Phase Initial) royalty surplus over TMC holds at all FWDC values ≥ $0. The FWDC ESTIMATED classification adds to, not subtracts from, this surplus.
  • At Phase Expanded (2,000 TPD), the 30-year nominal royalty position exceeds $1.8 billion. The net fiscal delta over 30 years at Phase Expanded — royalty plus avoided disposal minus TMC — exceeds $3 billion nominal. This is the magnitude of the liability inversion Carbotura proposes to execute at zero county capex.
Appendix

Appendix A — Sources and Methodology

FWDC Derivation
SLVL commercial gate rate $36/ton verified (saltlakecounty.gov/landfill/pricing/, 2025). Collection/transport overhead ~$19/ton estimated from industry standard. Total FWDC ~$55/ton ESTIMATED. Contract audit required during Term Sheet phase verification.
Beneficiation Fee Formula
MAX($100, MIN($150, FWDC − $5)) = $100/ton formula floor. User-specified TMC = $120/ton (above formula floor). Escalator: 2.5%/yr — Carbotura corpus locked.
Phase Sizing
Phase Initial 400 TPD / 4 modules = ceil(400/100). All module math verified in §3.2.
Royalty Formula
Royalty(m+13) = TMC(m) × Royalty_Rate(m). Base rate 120%; escalator +1pp/yr; 13-month lag. Corpus locked. No estimation.
Environmental Performance Basis
Carbotura standard parameters scaled to deployment TPD. ESTIMATED — community-specific commissioning results required.
Employment Basis
Carbotura standard 35 FTE / 155 FTE / 3× indirect multiplier at 400/2,000 TPD. ESTIMATED.
Timeline Basis
Carbotura standard deployment schedule: T0+3mo CFS complete; T0+6mo construction start; T0+24mo Phase Initial COD; T0+37mo first royalty. T0 = Q2 2026.

Appendix B — Glossary Additions

Gross Cost Displacement
The annual disposal expenditure avoided when feedstock routes to ACM instead of landfill. Equal to FWDC ($/ton) × committed tpy. Quantified separately from Circular Royalty™ — both required for full net fiscal position. See §4.1.
Net County Fiscal Position
Gross Cost Displacement + Circular Royalty™ Received − Beneficiation Fee Paid. Positive from Year 2 at all deployment phases. Distinct from regional economic impacts.
Pre-Royalty Period
Months 1–12 of CSA: Beneficiation Fee accrues; Circular Royalty™ = $0. Salt Lake County transition investment period. Must not be combined with post-Month 13 period in any average or blended figure.
Royalty Ramp Period
Month 13 to approximately Month 24: Circular Royalty™ begins at 120% of Month 1 Beneficiation Fee and builds to full run-rate on a rolling monthly basis.
Steady-State Period
Year 2 onward: full Circular Royalty™ at current escalated rate, with both TMC and royalty escalating simultaneously. Royalty exceeds TMC per ton by design throughout.
Delta Model
This document's analytical method: quantifying the difference between State A (current system) and State B (with Carbotura) across three components — gross cost displacement, Circular Royalty™, and Beneficiation Fee obligation.
State A
Current system: Salt Lake County continues routing manufacturing feedstock to SLVL and Trans-Jordan at current FWDC, with $0 royalty return and Trans-Jordan closure approaching ~2033.
State B
With Carbotura: 30-year CSA executed; Phase Initial (400 TPD) COD Q2 2028; Beneficiation Fee $120/ton; Circular Royalty™ begins Month 13 at 120% of corresponding Beneficiation Fee. Zero county capex.
US GAAP
Generally Accepted Accounting Principles (United States). Governing accounting standard for this EIR and the Salt Lake County ACM deployment — applicable to the US jurisdiction. All financial figures in this document are prepared on a US GAAP basis.

Appendix C — Evidence Chain

FigureValueSourceSource Type
SLVL gate rate$36/tonsaltlakecounty.gov/landfill/pricing/ (2025)VERIFIED
Trans-Jordan remaining capacity~8 yearsDraper Journal, April 2024VERIFIED — press
Post-closure cost increase3–4×Trans-Jordan director, Draper Journal, April 2024VERIFIED — press
Beneficiation Fee$120/tonUser-specified; Carbotura standard rateLOCKED
Circular Royalty™ formula120% base, +1pp/yr, 13mo lagCarbotura corpus locked parametersCORPUS LOCKED
Phase Initial CapEx$247.5M$75M + 3×$57.5M; Carbotura standardCARBOTURA STANDARD
FWDC~$55/tonSLVL gate $36 + overhead ~$19MODELED / ESTIMATED
Addressable feedstock~2,000 TPDCarbotura standard; Utah DEQ dataESTIMATED
Environmental performance~800,000 tCO₂e/yr at 2,000 TPDCarbotura standard parameters scaledESTIMATED